Frequently Asked Questions

What does the temperature need to be for applications of Renew by QC products?

The concrete temperature is most important. The concrete surface needs to range from
50 °F (10 °C) and 95 °F (35 °C). If the concrete temperature is too cold it will take a long time to dry. If it is too hot Renew by QC can “flash dry” and re-brooming Renew by QC will be impossible— allowing streaks or discoloration. In cold temperature applications, the surface will need to be above 50 degrees and rising for a minimum of 3 days.